F32-CG: Yes
Rationale
The selected SABR/CGR routing layer uses future contact times, rates, propagation ranges and backlog/volume accounting when computing and filtering candidate routes. It evaluates temporal and capacity feasibility rather than merely waiting for a link.
Assessment method
Primary documentary capability assessment; no new runtime experiment
Source context
Primary protocol specification or pinned implementation; selected-composition assessment
Outstanding qualification
CCSDS 734.3-B-1 sections 2.3–2.4 and 3.2.4–3.2.6. Supplied contact plans and clocks are required; route lists are recomputed on plan change. The existing BPv7/SABR metadata and complete-composition implementation qualifications remain open. LT inherits this from its explicitly selected SABR layer, not LTP alone.
Public sources
Editorial evidence references
The following identifiers refer to research records not included in this public package; they are not public links.
- round468.html
- round468-sources.json