F24-CG: Yes
Rationale
Architectural capability with the supplied contact/range plans already selected for this composition. SABR defines contacts by sending and receiving nodes, start/end times and rate, and assumes communication plans known to participants. A planned final-hop contact therefore provides a known receiving opportunity; BP can retain bundles until that contact and routing accounts for its timing.
Assessment method
Primary specification and pinned code review; no runtime experiment
Source context
SABR contact plans, LTP operating schedules and BP/TCPCL
Outstanding qualification
Bounded witness: provision coherent plans to the sender, receiver and final-hop forwarder, and use the receiver operating schedule to activate its link for the corresponding arrival interval, including propagation delay, clock error and setup/drain guards. Local link management must enforce that schedule for data and required control traffic; SABR itself does not switch radios or distribute plans. Updates require consistent reprovisioning, and a missed contact can require rerouting or retention until another opportunity, subject to bundle lifetime and storage limits. This is a supplied-plan architectural capability, not negotiated windows (F27), an executable power-management integration, or measured energy saving.
Public sources
Editorial evidence references
The following identifiers refer to research records not included in this public package; they are not public links.
- round506.html
- round506-sources.json