E01-RA: Pending
Rationale
The rlite README states that its demonstrator accepts configuration files interchangeable with the IRATI demonstrator. This establishes configuration compatibility, not an observed traffic exchange between the two stacks. The IRINA final report describes interoperability with the Pouzin Society prototype as an objective. Neither item supplies a completed cross-implementation test for the selected profile.
Assessment method
Distinguish documented demonstration scope from the criterion required evidence
Source context
Primary project documentary evidence
Outstanding qualification
Obtain a public test report identifying both independent implementations, versions, exchanged traffic and tested profile. Do not count interchangeable configuration files or a project interoperability objective as a completed result.
Public sources
Editorial evidence references
The following identifiers refer to research records not included in this public package; they are not public links.
- round674.html