Back to matrix

E01-RA: Pending

Rationale

The rlite README states that its demonstrator accepts configuration files interchangeable with the IRATI demonstrator. This establishes configuration compatibility, not an observed traffic exchange between the two stacks. The IRINA final report describes interoperability with the Pouzin Society prototype as an objective. Neither item supplies a completed cross-implementation test for the selected profile.

Assessment method

Distinguish documented demonstration scope from the criterion required evidence

Source context

Primary project documentary evidence

Outstanding qualification

Obtain a public test report identifying both independent implementations, versions, exchanged traffic and tested profile. Do not count interchangeable configuration files or a project interoperability objective as a completed result.

Public sources

Editorial evidence references

The following identifiers refer to research records not included in this public package; they are not public links.